Saltar
  • Transparency and Access to public information
  • Attention and services to citizens
  • Citizen participation
  • i
  • A-
  • A
  • A+

Investors
Investors
  • Clientes y Usuarios
  • Proveedores y Contratistas
  • Inversionistas
  • Gente EPM
  • Institucional
  • Corporate information
  • ESG Environmental, Social and Corporate Governance
  • Financial reporting
  • Transparency and Access to public information
  • Attention and services to citizens
  • Citizen participation
Fast transactions

Ayuda menú de accesibilidad

Icon

Mostrar el contenido con alto contraste para personas con discapacidad visual.

Icon

Reducir el tamaño de la letra.

Icon

Restablecer el tamaño original de la letra.

Icon

Aumentar el tamaño de la letra.

Icon

Habilitar el audio para usuarios con discapacidad visual u otras necesidades parecidas.

Icon

Atención al cliente en lengua de señas.

Icon

Configurar el idioma del sitio web.

Ema Asesora Virtual

  • Atención en línea Atención en línea
  • Carrito de compra Carrito de compra
    1

Cuéntanos tu opinión

Noticias y novedades Noticias y novedades

Noticias y novedades

  1. Investors
  2. Noticias y novedades
  3. EPM makes solid progress in the construction of the Tepuy Photovoltaic Solar Park

EPM makes solid progress in the construction of the Tepuy Photovoltaic Solar Park

The project, located in the municipality of La Dorada, department of Caldas, will contribute 83 megawatts of non-conventional renewable energy to the National Interconnected System (SIN, for the Spanish original).

Fecha de publicación
2023-03-16 00:00
Titulo
EPM makes solid progress in the construction of the Tepuy Photovoltaic Solar Park
Contenido

  • The project, located in the municipality of La Dorada, department of Caldas, will contribute 83 megawatts of non-conventional renewable energy to the National Interconnected System (SIN, for the Spanish original).
  • This is enough power to supply a city of 400,000 people.
  • The award of the contract to build the Park to Powerchina International Group Limited, one of the world’s leading wind and solar energy project construction companies, was the final step in the planned contracting processes for the Tepuy Park.
  • Of the 199,534 solar panels to be installed at the Tepuy Park, 17,280 have already arrived in Colombia. The works are currently focused on the step-up substation.



In line with Colombia’s energy transition, EPM is moving full power ahead on the construction and start-up of the Tepuy Photovoltaic Solar Park, its first large-scale non-conventional renewable energy project in Colombia, which will diversity its portfolio and energy supply to the community.

EPM awarded the Park’s construction contract under the Balance of System (BOS) modality to Powerchina International Group Limited, Colombian branch. The contract covers the designs; civil works; acquisition and transportation of equipment, materials, and accessories; installation; testing; commissioning, and performance of environmental activities.

The Works’ Progress

Construction of the voltage step-up substation is currently underway, which will enable raising the voltage of the power generated by the Tepuy Photovoltaic Solar Park, to then transport it through a 3.8-kilometer transmission line that is already in place to the Purnio substation of the company CHEC, an affiliate of EPM Group, to then link up with the National Interconnected System (SIN).

Constructora Durán Ocampo SAS is responsible for the civil works. Overall completion of the works currently stands at 68%, including the designs, civil works, acquisition and manufacturing of equipment, and other related activities.

Meanwhile, the firm Hefei JA Solar Technology, which is responsible for supplying the 199,534 bifacial solar panels for the Tepuy Photovoltaic Solar Park, made the fourth delivery of the panel containers of the total of eight scheduled deliveries. On its part, the firm Ayesa Ingeniería y Arquitectura S.A.U., Colombian branch, is responsible for the Project’s contract supervision.

Environmental and Social Management

Based on the commitments made in the environmental management plan, the Project’s construction is being monitored and ongoing relations are maintained with stakeholders in the territory.

Fundación EPM will carry out the activities related to the Environmental Education Plan that is to provide to the schools, community leaders and communities of the rural districts of Santa Helena, Purnio and Guarinocito, located in the area of influence of the Tepuy Photovoltaic Solar Park.

The Plan’s archaeological component has recovered over 3,000 stone (lytic) pieces of evidence as part of the preventive archaeological program, which following their study and classification will be handed over to Universidad de Caldas.

Strategies have also been implemented to communicate the Project’s progress, to disseminate the employment policy and to hire personnel from La Dorada and neighboring municipalities, using to this effect the jobs posting service of Caja de Compensación Familiar de Caldas (CONFA). To date, 89 jobs have been created for the works, 67 of them for people from the region. It is estimated that Tepuy will create over 200 jobs during the construction process.

With the Tepuy Photovoltaic Solar Park, EPM will contribute to the country’s energy transition and to Colombians’ wellbeing and quality of life.

Share on Whatsapp Share by email Download
EPM

Líneas de contacto

Medellín y Valle de Aburrá

+57 604 44 44 115

Línea nacional gratuita

+57 01 8000 415 115

WhatsApp

302 300 01 15

 

Línea ética Contacto Transparente

Reporta actos indebidos de los funcionarios y/o contratistas de EPM

 

+57 01 8000 522 955

O haz tu reporte aquí

Ver todas las líneas de contacto

Oficinas de atención

Oficina principal: Edificio EPM

Carrera 58 # 42 - 125 Medellín, Colombia. Lunes a viernes 7:30 a.m. a 4:30 p.m. Jornada continua

Ver todas las oficinas

 

Disfruta nuestros espacios

  • Museo del Agua EPM
  • Biblioteca EPM
  • Fundación EPM
  • UVAs - Unidades de vida articulada
  • Eventos EPM

Más cerca de ti

  • Trámites y servicios
  • Preguntas frecuentes
  • Peticiones, quejas, reclamos y recursos (PQR'S)
  • Consulta de radicados

Enlaces de interés

  • Acerca de nosotros
  • Grupo EPM
  • Entidades reguladores de servicios públicos
  • Sistema de información y Gestión del Empleo Público SIGEP
  • Gobierno Digital

A un clic

APP Móvil EPM Estamos ahí

Descárgala aquí 

Icon

Android

Icon

Apple

Correo corporativo

Notificaciones judiciales

 

Síguenos en:

  • Blog EPM
  • Facebook EPM
  • Instagram EPM
  • Twitter EPM
  • YouTube EPM
  • LinkedIn EPM
  • Spotify EPM
  • TikTok EPM
  • Aviso de privacidad y política de protección de datos personales
  • Términos y condiciones del sitio
  • Términos y condiciones aplicación móvil
  • Términos y condiciones envío de factura por WhatsApp
  • Mapa del sitio

EPM © Todos los derechos reservados 2024