Ayuda menú de accesibilidad

Mostrar el contenido con alto contraste para personas con discapacidad visual.

Reducir el tamaño de la letra.

Restablecer el tamaño original de la letra.

Aumentar el tamaño de la letra.

Habilitar el audio para usuarios con discapacidad visual u otras necesidades parecidas.

Atención al cliente en lengua de señas.

Configurar el idioma del sitio web.

Skip
Investors
  • Clientes y Usuarios
  • Institucional
  • Proveedores y Contratistas
  • Gente EPM
  • Inversionistas
  • Transparency and access to public information
  • Attention and services to citizens
  • Citizen participation
  • i
  • A-
  • A
  • A+
Investors
  • Corporate Information
  • ESG Environmental, Social and Corporate Governance
  • Financial reporting
Fast transactions
Procedures and services

Ema Asesora Virtual

  • Atención en línea Atención en línea
  • Carrito de compra Carrito de compra
    1

Cuéntanos tu opinión

News News

News

  1. Investors
  2. News
  3. EPM advances in the construction of Tepuy Solar Park

EPM makes solid progress in the construction of the Tepuy Photovoltaic Solar Park

The project, located in the municipality of La Dorada, department of Caldas, will contribute 83 megawatts of non-conventional renewable energy to the National Interconnected System (SIN, for the Spanish original).

Fecha de publicación
2023-03-16 00:00
Contenido

 

  • The project, located in the municipality of La Dorada, department of Caldas, will contribute 83 megawatts of non-conventional renewable energy to the National Interconnected System (SIN, for the Spanish original).
  • This is enough power to supply a city of 400,000 people.
  • The award of the contract to build the Park to Powerchina International Group Limited, one of the world’s leading wind and solar energy project construction companies, was the final step in the planned contracting processes for the Tepuy Park.
  • Of the 199,534 solar panels to be installed at the Tepuy Park, 17,280 have already arrived in Colombia. The works are currently focused on the step-up substation.

In line with Colombia’s energy transition, EPM is moving full power ahead on the construction and start-up of the Tepuy Photovoltaic Solar Park, its first large-scale non-conventional renewable energy project in Colombia, which will diversity its portfolio and energy supply to the community.

EPM awarded the Park’s construction contract under the Balance of System (BOS) modality to Powerchina International Group Limited, Colombian branch. The contract covers the designs; civil works; acquisition and transportation of equipment, materials, and accessories; installation; testing; commissioning, and performance of environmental activities.

The Works’ Progress

Construction of the voltage step-up substation is currently underway, which will enable raising the voltage of the power generated by the Tepuy Photovoltaic Solar Park, to then transport it through a 3.8-kilometer transmission line that is already in place to the Purnio substation of the company CHEC, an affiliate of EPM Group, to then link up with the National Interconnected System (SIN).

Constructora Durán Ocampo SAS is responsible for the civil works. Overall completion of the works currently stands at 68%, including the designs, civil works, acquisition and manufacturing of equipment, and other related activities.

Meanwhile, the firm Hefei JA Solar Technology, which is responsible for supplying the 199,534 bifacial solar panels for the Tepuy Photovoltaic Solar Park, made the fourth delivery of the panel containers of the total of eight scheduled deliveries. On its part, the firm Ayesa Ingeniería y Arquitectura S.A.U., Colombian branch, is responsible for the Project’s contract supervision.

Environmental and Social Management

Based on the commitments made in the environmental management plan, the Project’s construction is being monitored and ongoing relations are maintained with stakeholders in the territory.

Fundación EPM will carry out the activities related to the Environmental Education Plan that is to provide to the schools, community leaders and communities of the rural districts of Santa Helena, Purnio and Guarinocito, located in the area of influence of the Tepuy Photovoltaic Solar Park.

The Plan’s archaeological component has recovered over 3,000 stone (lytic) pieces of evidence as part of the preventive archaeological program, which following their study and classification will be handed over to Universidad de Caldas.

Strategies have also been implemented to communicate the Project’s progress, to disseminate the employment policy and to hire personnel from La Dorada and neighboring municipalities, using to this effect the jobs posting service of Caja de Compensación Familiar de Caldas (CONFA). To date, 89 jobs have been created for the works, 67 of them for people from the region. It is estimated that Tepuy will create over 200 jobs during the construction process.

With the Tepuy Photovoltaic Solar Park, EPM will contribute to the country’s energy transition and to Colombians’ wellbeing and quality of life.

Share on Whatsapp Share by email Download

Usamos cookies para mejorar tu experiencia

En este portal utilizamos datos de navegación / cookies propias y de terceros para gestionar el portal, elaborar información estadística, optimizar la funcionalidad del sitio y mostrar publicidad relacionada con sus preferencias a través del análisis de la navegación. Si continúa navegando, usted estará aceptando esta utilización. Puede conocer cómo deshabilitarlas u obtener más información, consultar política completa de cookies y política de tratamiento de datos personales

Configuracion cookies

Estas cookies son esenciales para que el sitio funcione y no se pueden desactivar. Ayudan con la seguridad, la autenticación de usuarios, el soporte al cliente, etc.

Cookies necesarias

Estas cookies nos ayudan a entender cómo los visitantes interactúan con nuestro sitio. Nos permiten medir el tráfico y mejorar el rendimiento del sitio.

Cookies de personalización

Estas cookies nos ayudan a entender cómo los visitantes interactúan con nuestro sitio. Nos permiten medir el tráfico y mejorar el rendimiento del sitio.

Cookies de analítica

Estas cookies nos ayudan a medir la efectividad de nuestras campañas de marketing.

Cookies de marketing y publicidad
Aceptar configuración
bg footer mobile
bg footer tablet
bg footer

Contacto

Reporte de daños y verificación de personal, llama gratis al:

+57 01 8000 415 415

Otras solicitudes:

+57 (604) 444 41 15

Asesora virtual Ema en WhatsApp:

+57 302 300 0115


Línea ética Contacto Transparente

Reportar actos indebidos de servidores públicos y/o contratistas de EPM

+57 01 8000 552 955

  1. Oficinas de atención

Oficinas de atención

Oficina principal: Edificio EPM

Carrera 58 # 42 - 125 Medellín, Colombia. Lunes a viernes 7:30 a.m. a 4:30 p.m. Jornada continua.

Ver todos los canales de atención al público


  1. Disfruta nuestros espacios

Disfruta nuestros espacios

  • Museo del Agua EPM
  • Biblioteca EPM
  • Fundación EPM
  • UVAs - Unidades de vida articulada
  • Eventos EPM
  1. Más cerca de ti

Más cerca de ti

  • Trámites y servicios
  • Preguntas frecuentes
  • Peticiones, quejas, reclamos y recursos (PQR'S)
  • Consulta de radicados

  1. Enlaces de interés

Enlaces de interés

  • Acerca de nosotros
  • Grupo EPM
  • Entidades reguladoras de servicios públicos
  • Sistema de información y Gestión del Empleo Público SIGEP
  • Gobierno Digital
  • Configurar Cookies
  1. A un clic

A un clic

APP EPM

Descarga la Aplicación móvil de EPM en App Store
Descarga la Aplicación móvil de EPM en Google Play

Correo corporativo

epm@epm.com.co

Notificaciones judiciales

correoepm@epm.com.co


Síguenos en

Ir al blog EPM
Ir al Facebook de EPM
Ir al Instagram de EPM
Ir al TikTok de EPM
Ir al LinkedIn de EPM
Ir al Spotify de EPM
Ir al Twitter de EPM
Ir al canal de YouTube de EPM
  • Manual de Derechos de Autor y/o autorización de uso sobre los contenidos
  • Política de protección de datos personales
  • Términos y condiciones del sitio
  • Mapa del sitio

EPM © Todos los derechos reservados 2026